Skip to content
Woodwork Calculator

Epoxy Calculator

Pick the shape, enter the size and depth, and get the resin in gallons, liters and ounces, split by your mix ratio and broken into pours your product can handle.

Your numbers

Pour shape
in

Inches, or feet and inches like 6' 2.

in

Measure the gap in five or six places and average them.

in
in
in

For a flood coat on a tabletop, about 1/8″.

in

Tabletop epoxy is often 1/8″ to 1/4″. Deep-pour resins allow 1″ to 2″. Use your product's number.

%
gal

Optional. Total gallons per kit, both parts together.

Total epoxy—
Plate 09The pour drawn in oblique with an enlarged section. Dashed lines mark where each pour ends.
Resin—
Hardener—
Pours—

Full result

Volume of the pour—
With extra—
US gallons—
Liters—
Fluid ounces—

Mixing plan

Ratio—
Resin, total—
Hardener, total—
Pours—
Mix per pour—
Kits—

How the epoxy calculator works

Resin is sold by volume, so the job is to find the volume of the space you're filling and convert it. Work in inches, multiply out the cubic inches, and divide by 231, the number of cubic inches in a US gallon.

river or rectangle: volume = length × width × depth
round: volume = 3.1416 × (diameter ÷ 2)² × depth
gallons = cubic inches ÷ 231
liters = gallons × 3.785

Here's a typical river table. The river runs the full 72″ length, averages 8″ wide and the slabs are 1 1/2″ thick. That's 72 × 8 × 1.5 = 864 cubic inches. Add 10% and you have 950 cubic inches, or 4.11 gallons (15.6 liters). With a 2:1 product, that's 2.74 gallons of resin and 1.37 of hardener.

If your resin is rated for 1/4″ per pour, that river takes six pours. A deep-pour resin rated for 2″ could do it in one. The plate shows the layers either way, so you can see how many evenings the project will take.

Measure the river, not the slab

Live edges wander. A river that's 5″ at one end and 11″ in the middle isn't an 8″ river until you average it. Lay a tape across the gap every foot or so, add the readings and divide by how many you took. If the live-edge slabs have voids, bark pockets or cracks you plan to fill, add a little for each one.

Measure depth from the bottom of the mold to where you want the finished resin, not to the top of the slab. If you're planning to flatten the whole top afterward, many people pour slightly proud and plane it down. Count that extra in the depth.

Heat, layers and pour depth

Epoxy gets hot as it cures. The thicker the mass, the more heat it holds, and too much heat can crack the resin, cloud it, pull it away from the wood or yellow it. Each product is designed for a maximum thickness per pour, and that number is on the label or the technical data sheet. Use it as the max depth per pour here.

  • Coating or tabletop epoxy is made for thin layers: flood coats, seal coats and shallow inlays.
  • Deep-pour or casting resin cures slowly so it can go in much thicker, which is what most river tables use.
  • Room temperature counts. A warm shop speeds the cure and the heat; a cold one can leave the resin soft. Follow the temperature range on the label.

Between layers, follow the recoat window your product gives. Pour too early and the heat stacks up; wait too long and you may need to sand for the next layer to bond.

Ratios by volume and by weight

A 2:1 ratio by volume isn't 2:1 by weight, because resin and hardener have different densities. If the kit gives both, use whichever you can measure accurately. Graduated cups work for volume; a scale is better for weight on large batches. Mix each pour in one batch when you can, and scrape the sides and bottom of the bucket. Unmixed resin from the walls is the usual cause of soft, sticky spots.

Small steps that save resin

  • Seal the wood first with a thin coat brushed into the edges. It stops air in the grain from bubbling up through the pour and cuts down on soak-in.
  • Build a tight mold. Melamine or MDF lined with sheathing tape, with every seam caulked. A slow leak overnight can drain a quarter of a pour.
  • Keep 10 to 15% extra. Some always stays in the bucket and on the stir stick.

Pricing the wood too? The board foot calculator handles the slabs, and with both numbers you have most of the material cost of the table.

Questions people ask

How much epoxy do I need for a river table?

Multiply the river's length by its average width by its depth, in inches, then divide by 231 to get gallons. A 72″ river averaging 8″ wide and 1 1/2″ deep holds 864 cubic inches, which is 3.74 gallons. Add 10% for what soaks into the wood, leaks from the mold and stays in the mixing bucket, and plan on about 4 1/8 gallons.

How do I use this as an epoxy resin calculator for a mix ratio?

Choose your product's ratio and the calculator splits the total into resin and hardener. At 2:1, two thirds of the volume is resin and one third is hardener. Most kits list a ratio by volume and another by weight, and they aren't the same. Measure with the method the label gives you.

How much epoxy for a tabletop flood coat?

A flood coat is usually about 1/8″ thick. A 6 × 3 foot top at 1/8″ is 72 × 36 × 0.125 = 324 cubic inches, or 1.4 gallons, and about 1.54 gallons with 10% extra for drips over the edge. Choose the rectangle shape and set the depth to 1/8″.

How deep can I pour epoxy in one layer?

It depends entirely on the product. Coating and tabletop epoxies are generally meant for thin layers, often around 1/8″ to 1/4″. Deep-pour casting resins are formulated to cure slowly so they can go in thicker, commonly 1″ to 2″ per pour. Pour thicker than the label allows and the heat from curing can crack, yellow or warp the piece. Set the max pour depth to your product's number.

How many gallons of epoxy is a cubic foot?

A cubic foot is 1,728 cubic inches, and a US gallon is 231 cubic inches, so one cubic foot is about 7.48 gallons, or 28.3 liters.

Why does my pour always run short?

Three usual reasons: the river is wider in places than you measured, raw wood soaks up resin (especially end grain and punky spots), and the mold leaks. Measure the river width in five or six places and average them, seal the wood with a thin coat first, and keep the waste allowance at 10 to 15%.

Put this calculator on your site

Lumber yards, sawmills and woodworking blogs are welcome to embed it for free. Paste the code into any page; it loads the calculator only, without our header or articles.